Envirolink

Top

Biomass

Biomass Strategy for England's Northwest: Summary Report 2010  

The Biomass Strategy aims to increase biomass electricity and heat generation in
England’s Northwest from the 2009 level of around 1.5 TWh per year to 12.3 TWh
per year by 2020.

For further information and to view the Summary Report please see the below attachment.

100727%20Biomass%20Summary%20Report.pdf 100727 Biomass Summary Report.pdf (990.4 KB)

Brazil language site | Find a supplier | Contact us | Sign up
Original content © 2010 by Envirolink | Design © 2010 by Tribal Group plc all rights reserved